References

Osmaniye, Düziçi Project
Project Status :
Under Construction

Luleburgaz Project
Capacity:
10.710 Wp
PV panels: Jinko JKM 255p
Water pump: Lorentz PS9k2 C-SJ8-44D / submersible pump
Avarage water flow rate during summer: 60 m³/day
Avarage water flow rate: 51m³/day tone
Depth of well: 180 m
Depth of submersible pump: 130 m
Location: Lüleburgaz, Turkey
Installation date: 13.05.2016
Used for: Drip irrigation 40.260 m² / cherry garden

Antalya Kaş Project
Project Status :
Under Construction

Aydın Didim Project
Project Status :
Under Construction

Tokat Turhal Project
Project Status :
Under Construction

Dikili Res Project
Project Status :
Under Construction
Capacity: 5 MW
Number of Turbines: 2 Vestas V126 3.45MWh
Turbine Height: 87 m
Rotor Diameter: 126 m
Annual Yield: 19.200 MWh/year
Bağlantı Noktası: Kurtyeri DM, 34,5 kW
Location: Kocaeli Province, Kandıra District, Dikili village
ınstallation Date: Kasım 2016

Konya Kulu Project
Capacity: 5 MW
PV Panels: 15464 x Yingli Solar 260Wp Polycrystal Panels
Inverter: 132x ABB Trio 27.6-TL
Location: Konya Kulu

Yırca School PV Greenpeace Project
Capacity: 3.06 kWp
PV panels: 12 x 255 Wp Jinko polycrystalline panels
Annual production: 4630 kWh/year
Inverter: Multiplus hybrid inverter 3kVA
Battery capacity: 9.6 kWh
Monitoring system: Victron Color Control
Location: Manisa Province, Soma District, Yırca village
Installation date: October 6, 2015

Yırca Mosque Greenpeace PV Project
Capacity
: 5.355 kWp
PV panels: 12 x 255 Wp Jinko polycrystalline panels
Annual production: 5833 kWh/year
Inverter: Multiplus hybrid inverter 3kVA
Battery capacity: 9.6 kWh
Monitoring system: Global Remote Modem
Location: Manisa Province, Soma District, Yırca village
Installation date: October 6, 2015

Mersin/Mut PV-Powered Drinking Water System
Capacity: 3.57 kWp
PV panels: 14 x 255 Wp Jinko JKM255P polycrystalline panels
Water pump: Lorentz PS4000 CS-F8-8 surface pump (4 kW capacity)
Average water flow rate during summer: > 45 m3/day
Average water flow rate: > 35 m3/day
Pressure head: 60 m
Suction head: 2.5 m
Pipe length: 800 m
Location: Mersin Province, Mut District, Gökçekaya village
Installation date: August 18, 2015

Bursa Forest Observation Tower Off-Grid PV System
Capacity
: 4.08 kWp
PV panels: 16 x 255Wp Jinko JKM255P polycrystalline panels
Annual production: 5940 kWh/year
Inverter: Victron Phoenix 5KVA, Victron MPPT 150/85 charge controller
Monitoring system: Victron Global Remote Modem
Location: Bursa Province, Karacabey District
Installation date: August 8, 2015

Şanlıurfa PV-Powered Agricultural Irrigation System
Capacity
: 64.26 kWp
PV panels: 252 x 255Wp Jinko JKM255P polycrystalline panels
Water pump: Lorentz PS40k2 C-Sj95-7-D submersible pump (37 kW capacity)
Average water flow rate during summer: > 1200 m3/day
Average water flow rate: > 730 m3/day
Depth of well: 85 m
Depth of submersible pump: 72 m
Location: Şanlıurfa Province, Akçakale District, Gündaş village
Installation date: April 18, 2015

GASKİ Solar Car Park
Capacity
: 120.285 kWp
PV panels: 891 x MiaSolé 135Wp CGIS thin-film panels
Annual production: 199,200 kWh/year
Inverter: 4 x Power-One Trio 27.6
Monitoring system: PVI-AEC-EVO Datalogger and Aurora Vision Platform
Location: Gaziantep Su ve Kanalizasyon İdaresi [GASKİ], Gaziantep
Installation date: March 24, 2015

Keşan Off-Grid PV System
Capacity
: 0.49 kW
PV panels: 2 x 245 Wp Yingli polycrystalline panels
Annual production: 1138 kWh/year
Inverter: Voltronic
Location: Edirne Province, Keşan District
Installation date: July 15, 2014
Includes battery bank for energy storage

The Ritz-Carlton Istanbul Hotel PV System
Capacity
: 3.92 kWp
PV panels: 16 x 245 Wp Yingli polycrystalline panels
Annual production: 4130 kWh/year
Inverter: Goodwe DS Series
Monitoring system: Goodwe EZ Loger
Location: The Ritz Carlton Hotel – Beşiktaş/Istanbul
Installation date: July 7, 2014

Borçelik Company Building PV Rooftop Installation
Capacity: 30 kWp
PV panels: 120 x 250Wp Yingli polycrystalline panels
Annual production: 40,700 kWh/year
Inverter: 2x SMA Sunny Tripower
Monitoring system: SMA Webbox Bluetooth and Sunny Portal
Location: Borçelik General Management Building, Gemlik
Installation date: March 3, 2014

EkoRE Headquarters PV Rooftop Installation
Capacity
: 2.94 kWp
PV panels: 12 x 245 Wp Yingli polycrystalline panels
Annual production: 3700 kWh/year
Inverter: SMA Sunny Boy
Monitoring system: SMA Webconnect and Sunny Portal
Location: EkoRE office building, Maltepe/Istanbul
Installation date: December 20, 2013

Akatlar/Istanbul Grid-Tied Rooftop PV System
Capacity
: 4 kWp
PV panels: 16 x 250 Wp Yingli polycrystalline panels
Annual production: 5000 kWh/year
Inverter: Fronius Symo 3.7-M
Monitoring system: Fronius Inverter Wifi
Location: Akatlar/Istanbul
Installation date: October 16, 2014